Early Positive News from Richmond, Virginia Redesign

by Scudder Wagg

It’s been nearly three months since the launch of the Pulse Bus Rapid Transit line, and the bus network we helped design, for the City of Richmond and its transit agency.

The early news looks positive for ridership. For some context, the redesigned network was intended to shift the balance of the network from about 50% ridership focus to about 70% ridership focus.

Prior to the launch of the new network, weekly ridership was averaging about 141,000. The first week of the new network saw huge ridership, 226,000 for the week, but that was driven by free rides. Immediately after the launch, ridership remained near or above the pre-launch ridership levels (if you ignore the July 4 holiday week). And since August, ridership has climbed to about 157,000 per week, an 11% gain.

Any gain at this point is good news.  It’s normal for there to be a slight dip in ridership just after implementation, as people take time to adjust to the new network, and for ridership to then grow gradually over two to three years.

Some of this gain is attributable to the new partnership with Virginia Commonwealth University (VCU). VCU has partnered with the transit agency by investing $1.2 million per year in exchange for transit passes for all students, faculty, and staff. VCU was drawn to this partnership in part by the obvious value that the new BRT and Route 5 (part of our network design) provided to the University. And its willingness to invest in the service is a good sign of the renewed confidence that many have in the usefulness of transit service in Richmond.

That confidence is reinforced by the expansion of service that happened this past weekend in adjacent Henrico County. The County decided this past spring to add evening and weekend service on three routes and extend service to Short Pump, the largest suburban retail and jobs center in the region. That expansion launched on September 16.

More time and data will help make clear how much ridership growth is attributable to network design and how much is attributable to other factors. But the early signs are positive, and we hope they continue in that direction and spur additional improvements in transit for Richmond.

 

Scudder Wagg, who played a central role in the Richmond project, manages the US East Coast practice for Jarrett Walker + Associates.

6 Responses to Early Positive News from Richmond, Virginia Redesign

  1. JJJ September 26, 2018 at 1:47 pm #

    Sounds to me like cost is the real deciding issue.

  2. Sean Gillis September 27, 2018 at 6:43 am #

    Hi Scudder,

    Looking for clarity. Does the system provide 157,000 rides per WEEK, or per WEEKDAY?

    11% ridership growth, new BRT, and expanded suburban service. Good stuff.

    Sean

    • Scudder Wagg September 27, 2018 at 9:42 am #

      It’s 157,000 per week. Average weekday numbers look to be around 27,000 boardings as of early September.

      • Sean Gillis September 27, 2018 at 12:14 pm #

        As a Canadian it is always shocking to realize how much lower ridership is in mid-size American cities. Ottawa (population 950,000) has 340,000 riders a day on OC Transpo.

        Is part of the boarding increase caused by more transfers? Or would boardings be equivalent to trips (with or without transfer)?

        • Scudder Wagg October 6, 2018 at 9:14 am #

          Yes, we regularly point to Canadian cities and their higher per capita investment in service as an example of you can get more ridership and more transit relevance with more service per capita. While the whole Richmond metro area has over 1 million people the area with substantial service, 7-days per week is mostly just within the City of Richmond proper, population about 215,000. That is starting to change with the expansion of service in Henrico, where they now have three routes with evening and weekend service.

          Our network design include some changes that would reduce transfers such as three major north-south spines that go through downtown where you previously had to transfer. Also, the introduction of the orbital route allows for more trips to and from the west end without transferring.

          The design did included some changes that would require more transfers, such as terminating some west end routes at BRT stations outside of downtown. On balance, I think the impact on transfers from our network design is probably minimal.

  3. El_slapper September 27, 2018 at 11:28 pm #

    Just had a look at my own southern France metropolis. The 31 towns that TAM-Montpellier are covering have a total of 451,000 inhabitants, Tramway lines are carrying 268,000 passengers per day, and buses 120,000. Which is even more impressive. Numbers are from official sites.

    It’s a student town(25% of the population) and a touristic town, which pushes those numbers up, not counting the fact that the whole centertown is closed to cars(too old, streets are too narrow for automotive traffick), but still. 27,000 passengers per day for 223,000 inhabitants seems very low to me – even if the trend up is heartwarming.